beereau

How to switch help desks without losing tickets: a migration checklist

A step-by-step checklist to switch help desk software: what to export, how to run both tools in parallel, a cutover plan and what to verify afterward.

By the beereau team. Published . 5 min read.

Short answer: To switch help desks safely, export everything first, set up and test the new tool with a few real messages, run the old tool read-only for history, and change email routing last during a quiet period. Keep forwarding from the old address for a few weeks, and check both tools daily until nothing arrives in the old one. For a small team, plan one to three weeks.

A help desk migration is moving your tickets, customers, saved replies and settings from one tool to another. The risk is not the data; it is the gap in the middle, when a customer writes and nobody sees it. This checklist is designed to close that gap.

Why are you switching, and is it the right time?

Write one sentence: "We are switching because ___." Good reasons are specific: cost, a missing feature, a team that outgrew the limits. Bad reasons are vague: "it feels old."

Reason Fix by switching? Consider first
Price too high at current volume Often Check customer support software pricing for alternatives
Missing feature you need weekly Yes, if the new tool has it Check it is in your plan, not a higher tier
Messy setup Maybe A cleanup of the current tool may be enough
Team not using it Rarely Training and simpler rules
Hit free plan limits Yes See free ticketing system limits

Avoid migrating in your busiest week. Pick a quiet stretch, not the weeks around a sale or a holiday.

What should I export first?

Do this before anything else, so you have a safety net.

Item Why it matters Format to ask for
Tickets and messages History customers may refer to CSV or JSON, plus attachments
Customers and contacts Names, emails, notes CSV
Tags and categories Reporting and routing logic List
Saved replies or macros Your best answers Copy to a document
Knowledge base articles Customer-facing content Export or copy
Automation rules You will rebuild them Screenshots and written descriptions
Satisfaction data Trends CSV
Email settings and aliases Routing and sending Written list

Store exports in a dated folder. Check you can open them; an export you cannot read is not a backup. Note what the old tool cannot export, such as some attachments or internal notes, so you are not surprised later.

How do I plan what to migrate?

You rarely need everything.

  1. Open tickets. Always migrate or finish these before cutover.
  2. Last 6 to 12 months. Useful for repeat customers.
  3. Older history. Keep as exported files; search them if needed.
  4. Spam and tests. Leave behind.

Decide a cut-off date and write it down. Example (illustrative): "We move tickets from May 1 onward, close everything older than 30 days in the old tool, and keep the older export in a shared folder."

What does the migration timeline look like?

Phase What happens Typical time for a small team
1. Prepare Reasons, export, clean up old tags 2 to 3 days
2. Set up Build the new tool: inboxes, users, tags, replies 2 to 4 days
3. Test Send real messages, test each rule 2 to 3 days
4. Cutover Switch email routing, announce internally An afternoon
5. Parallel Old tool read-only, forwarding kept 2 to 4 weeks
6. Close Final export, cancel, review 1 day

These durations are rough planning estimates for a small team, not vendor figures.

What is the cutover checklist?

Use this on the day.

  1. Pick a quiet time, such as early morning on a weekday, with someone available to watch.
  2. Finish or reassign every open ticket you are not migrating.
  3. Run a final export from the old tool.
  4. Import tickets and customers into the new tool, and spot check 20 records.
  5. Verify saved replies and tags.
  6. Check email authentication for sending from the new tool; our guide to forwarding support email explains SPF, DKIM and DMARC basics.
  7. Change routing so that the support address delivers to the new tool.
  8. Keep the old routing as a forward for at least a few weeks.
  9. Send test emails from three outside addresses, and reply from the tool. Check inbox and spam.
  10. Tell the team the exact time the new tool is live, and put a short note at the top of the old one.

Tell customers?

Usually not needed if the support address stays the same. If the address or reply-to changes, say so in a short note.

How do I handle the parallel period?

For two to four weeks:

  • New tickets live in the new tool only.
  • The old tool is read-only for lookups.
  • Check the old inbox or forwarding rule daily for anything that slipped through.
  • Keep a short list of "things that broke" and fix each one.
  • Review the first week's reply times against your old numbers.

What breaks most often, and how do I test it?

Risk Test
Emails land in spam Send replies to Gmail, Outlook and a work address
Attachments missing Open five migrated tickets that had attachments
Automation does not match old rules Send one test message for each rule
Wrong assignee Create a test per category
People using the old tool Remove edit access from the old one
Customer duplicates Search for three known customers

Keep your policies and approvals

A migration is also a chance to check refund rules and approvals. Who may approve what? Write it down before you rebuild. If you use AI to draft replies, see approving AI replies before sending.

Can AI help with a switch?

It can help draft replacement templates and summarize your rules into a plain-language list. Have a person check routing, refund rules and the export. If you are moving to an AI-first setup instead of another help desk, note that beereau takes a forwarded support inbox rather than importing a ticket history, so plan to keep your old exports for history. See the AI customer support team page for what it does.

After the move: what do I verify?

  • Reply time and backlog compared with the last month in the old tool.
  • Complaints about lost or duplicate messages.
  • Saved reply use and any missing ones.
  • Costs against what you expected.
  • A final export from the old tool before cancelling.

Cancel the old subscription only after the parallel period ends and the final export is safe.

Next step

Write your reason for switching and your cut-off date on one page, then schedule the export for this week. Block a quiet two-hour window for cutover with a named person watching, and put the date in your calendar. Do not cancel the old tool until a month after the switch.

Frequently asked questions

How long does it take to switch help desks?

For a small team with a few thousand tickets, plan one to three weeks from decision to cutover, mostly for cleanup, setup and testing. The actual cutover can take an afternoon.

Do I need to migrate old tickets?

Not always. Many small businesses migrate only the last six to twelve months and archive the rest as exported files. Migrate what your team will actually search for.

What should I export before leaving a help desk?

Tickets with messages, customers, tags, saved replies or macros, knowledge base articles, automation rules (as documentation), and any satisfaction data. Also export a list of integrations and email settings.

How do I avoid missing customer emails during the switch?

Change the email routing last, during a quiet period, keep forwarding from the old address for a few weeks, and check both inboxes daily until you are sure nothing arrives in the old one.

Should I run both tools in parallel?

Yes for a short period. Use the new tool for new tickets and keep the old one read-only for history. Running both for new work causes confusion.

What breaks most often in a migration?

Email authentication and routing, attachments that fail to import, automation rules that do not translate, and people reverting to old habits. Test each before cutover.

Can AI help with the switch?

It can help summarize rules and draft replacement templates, but people should verify routing, refund rules and data export. Treat AI output as a draft to review.